A purchase order does not control work. The warehouse and contractor must agree the task, hazards, interfaces and handback before activity starts.

Beginner-friendly animated guide

Learn Contractor control and permit-to-work from the beginning

Plan and control contractor work in an operating warehouse, including induction, isolation, permits, handback and retained evidence. Use the controls to study one section at a time. No previous warehouse knowledge is required.

Step-by-step

Read the complete animation transcript

    Stop and escalate

    Stop the job when scope changes, isolation is uncertain, the permit expires, controls are removed, weather or operations create new risk, or unauthorised people enter the work area.

    Before mobilisation

    Permit and isolation

    Supervision and handback

    Records

    Questions for the supervisor review

    1. Who owns the area and who supervises the contractor?
    2. Are warehouse operations creating hazards for the contractor or vice versa?
    3. Can every isolation point be identified and verified?
    4. What inspection proves the area is ready for handback?

    Useful measures

    Use your own verified history and risk profile rather than a generic target. Review these measures together:

    Turn the review into action

    Record the exact location, observation, immediate control, risk, accountable owner, due date and closure evidence. Review repeated or overdue issues with management and the competent specialist for the subject.

    Open checklists and registers Safety review centre

    Original field application

    Work the problem from evidence to closure

    Practice situation

    A maintenance contractor must weld near stored packaging while normal operations continue. The useful response is not a generic target or a tick-box answer. Start by defining the exact event, location, item, time period and decision owner so that another reviewer can reproduce what happened.

    Decision path

    Define the exact work area, isolate energy and combustibles, verify competence, issue the permit and close it after inspection. Record assumptions before changing the process. Compare the proposed control with the current condition, test it on a limited scope where appropriate, and define the condition that would require work to stop or management to escalate.

    Evidence pack

    Risk assessment, isolation record, permit times, gas test where applicable, fire watch and closure signature. Keep the source record with the action rather than copying only a summary into a presentation. A complete pack should show who reviewed the information, what was excluded, the date of the decision and proof that the action was later checked.

    Supervisor walkthrough

    1. Observe the work at the location and ask the operator to explain the normal sequence.
    2. Compare the observed sequence with the written standard and system record.
    3. Separate an isolated exception from a repeated condition by checking recent history.
    4. Agree one immediate control and one corrective action with a named owner and realistic date.
    5. Return after implementation and verify the result with evidence, not verbal confirmation.

    Common failure to avoid

    Do not close the review with “team advised” or “monitor closely.” Those statements do not identify a changed control, accountable owner or effectiveness check. A useful closure states what changed, where it changed, when it was checked and what result would reopen the issue.

    Primary sources to verify