Make shift utilization, absenteeism and peak coverage explicit.

Beginner-friendly animated guide

Learn Plan staffing from workload from the beginning

Make shift utilization, absenteeism and peak coverage explicit. Use the controls to study one section at a time. No previous warehouse knowledge is required.

Step-by-step

Read the complete animation transcript

    By · Reviewed 23 September 2026

    Measure work consistently

    Separate receiving, put-away, picking, packing and dispatch. Record productive hours and completed units using the same scope. Avoid mixing lines per paid hour with lines per productive hour.

    Worked example

    1,920 pick lines at 40 lines per productive hour require 48 productive hours. An eight-hour shift at 75% productive time gives six hours per person. Eight people must attend; with 10% absence, the roster requirement is 8 ÷ 0.9, rounded up to nine. Other work adds to this requirement.

    Separate base from peak

    The tool shows average and peak demand, then lets you choose what share of extra peak capacity to retain. The balance may require planned flexible capacity, scheduling or process changes; it does not disappear.

    Check costs and constraints

    Set actual operating days for cost-per-unit calculations. Validate breaks, skill coverage, supervision, equipment and applicable working-hour rules with the responsible team.

    Calculation conventions and corrections · All guides

    Original field application

    Work the problem from evidence to closure

    Practice situation

    Overtime rises although average daily volume appears stable because workload peaks are hidden. The useful response is not a generic target or a tick-box answer. Start by defining the exact event, location, item, time period and decision owner so that another reviewer can reproduce what happened.

    Decision path

    Convert each activity into workload by interval, apply demonstrated rates and include absence, breaks and variability. Record assumptions before changing the process. Compare the proposed control with the current condition, test it on a limited scope where appropriate, and define the condition that would require work to stop or management to escalate.

    Evidence pack

    Volume profile, task standard, paid hours, productive time, skill constraint, plan and actual variance. Keep the source record with the action rather than copying only a summary into a presentation. A complete pack should show who reviewed the information, what was excluded, the date of the decision and proof that the action was later checked.

    Supervisor walkthrough

    1. Observe the work at the location and ask the operator to explain the normal sequence.
    2. Compare the observed sequence with the written standard and system record.
    3. Separate an isolated exception from a repeated condition by checking recent history.
    4. Agree one immediate control and one corrective action with a named owner and realistic date.
    5. Return after implementation and verify the result with evidence, not verbal confirmation.

    Common failure to avoid

    Do not close the review with “team advised” or “monitor closely.” Those statements do not identify a changed control, accountable owner or effectiveness check. A useful closure states what changed, where it changed, when it was checked and what result would reopen the issue.

    Method and verification

    This lesson is an operational decision aid. Reconcile definitions to your contracts, system fields and approved local procedure. See the calculation and evidence method.